Green Infrastructure Project Update - A tale of voles and holes

It was wet and windy when we met to celebrate the completion of the Greater Easterhouse Green Infrastructure project back in December. The site at Blairtummock was perhaps a little raw looking, however, the cool temperature and soggy surrounds couldn’t dampen the enthusiasm for a great transformation.